Save 35% reduction in patch application time and 50% in DBA

Key Technologies: Oracle EBS, RingMaster APM

Save 35% reduction in patch application time and 50% in DBA

About The Client

Our client is one of America’s leading transportation suppliers. Their network encompasses 21,000 route miles of track across the US and Canada. It serves nearly two-thirds of the American population through a network spanning 23 states, the District of Columbia, and two Canadian provinces.

Case Study Overview:

SuneraTech, with the help of RingMaster, automated the entire patching process. It provided a pre-application analysis and a post-application report on the impact of the patch. It also automated the patch download and application processes, thereby significantly reducing the change management process—increased patch adoption by saving 50% time and reduced patching efforts by 30 % through automation.

Download the Case Study

Related Case Studies

Save 70% in test coverage and 25% reduction in cycle time in fuel & logistic industry

We helped a company in the Fuel & logistic industry to reduce the overall testing efforts by 50% & reduce the defects leaked to production.
Webinars